Your current location:home > News > News Details
China Gas Information
On December 22 afternoon, cnooc give reporters sent mail says, at 22,, cnooc shenzhen branch the zhuhai terminal in natural
gas pipeline pressure to close to the state for maintenance. Ensure operations in safety and protection of the Marine
environment, and on the basis of shenzhen branch is carrying out of sealing of exploration, the homework.
Cnooc said, 22 morning, zhuhai terminal began to the sea into nitrogen pipe to exchange the sea of remaining inside the
natural gas. At present, a ship to dig sand ship has set up a file in the leak upstream position began to work, to provide
working face of exploration work.
It is worth noting that, the scene of the accident for 1 m high waves, wind 5-level 6, not suitable for diving operations.
Diving exploration work need to wait for a good time.
Related anti-fouling, safety, aid ships and cars already on the scene, dock or terminal in place, guarantee the field staff
work safety, environment from pollution. By now, the oil spill has not found.
The mail, said the impact of the event of natural gas by net production is about 160 million cubic feet per day, $26700
barrel of oil/day.