Your current location:home > News > News Details
China Gas Information
West door natural gas station extension project of natural gas transmission and distribution engineering on rizhao city allocated to the project, the main function is to receive the oil in tablet profile to donggang long distance pipeline and oil in JiaoZhou to sunshine long distance pipeline to gas, the add smelly, filtration, pressure regulating, measure, to the sunshine city supply natural gas.
The project mainly construction content is in the existing door station equipment, and on the basis of a new increase receiving, pressure regulating measurement device and oil in the station docking and, in conjunction with the original equipment for gas supply of main urban areas. November 15, the engineering measure equipment has the arrival of the surge and hoisting in place, the next step will be for equipment assembly and pressure pipe installation work, engineering plan completed by the end of this year and has put into production conditions, realize rizhao double gas source pattern.