Your current location:home > News > News Details
China Gas Information
October 31,, reporter from petroleum gas company to learn in nanchong, after the city's
Sherwood road engineering, city gas pipeline diverted (gas pipe size expansion project have
since the launch, a bear the the city of gas supply main kei igawa the reconstruction
project in recently in full swing.
According to information, the transformation of the line is located in the east stand and
store with a stand between five miles of about 1.2 kilometers long store district in the
main gas pipe. "The reform is to cooperate with gas pipeline engineering upgrade the
livelihood of the people about five miles shop." Petroleum gas company in nanchong
technology controller introduces said, miles of gas pipeline corner store district in the
original more, thus formed the more pressure loss point, causing gas pipe pressure along
enough. This transformation is mainly in the main article bend "capture" and "pull", in
order to improve the efficiency of the use of fuel gas. "After the transformation will use
the 219 mm diameter of gas pipeline, so it can ensure sufficient foot pressure gas supply."
The official said that, in the gas pipeline during reconstruction, will not affect the
store with a stand for the city residents of a gas supply, reconstruction project will end
in the middle of November.
At the same time, gas pipe diameter expanding engineering (has ended, white horizontal area
west of gas pipeline project has been diverted to a close. Three big pipeline of
modification measures implemented step by step, will ensure that urban residents of the
timetable for an American winter gas for smooth lose.