Your current location:home > News > News Details
China Gas Information
September 2, was informed that the first set of northwest Sichuan Gas Field day treatment of 10 million cubic meters of natural gas, non-acidic single well integrated skid-mounted gas gathering unit in the Jiulong Mountain Dragon 002-H2 gas wells put into operation. Successful operation of the device, not only improve the efficiency of gas field development, well productivity to accelerate the new contribution rate, and ease of field standardization, digital management.
Integrated skid-mounted units, compared with conventional single-well stations, has the following advantages. First, the process equipment optimization. Breaking the traditional design methods, optimization of process equipment will be well stand as an integrated set of skid-mounted integrated devices, enabling the factory prefabricated, easy to overall transport, lifting and installation, but also reusable, easy to install and remove. The second is multi-functional integration. The heating, cutting, separating, metering, filling, emptying, sewage and other multi-functional integration, can increase maintenance efficiency to achieve centralized management.