Your current location:home > News > News Details
China Gas Information
22 July, "west-east gas station at the end of the second line of guangzhou in pressure has risen to 6.2 million mpa. With the second line of all main west powerstation, and "west-east gas pipeline company responsible for the operation of the total length of 8959 km by pipeline to 10073 km, for the first time more than 10000 miles.
At present, "west-east gas pipeline company management operation two main lines, namely" west-east gas line and a second line of west-east gas transmission part; Article 4 the main, namely changzhou to set far to changxing, hefei, nanjing to wuhu and ZaoYang to xiangfan a line; Article 5, that is, JiNing non non huai WuLian characteristics, west, second line central defender to JingBian tie, xiangfan pigging stand to loyal wu JiLiangZhan xiangfan tie, HuangBei line contact pressure QiZhan huai to wu lines; Article 13 extension and persuaded by the cash register line line, blue. The station number has risen to 126 seats.
These pipeline route 17 provinces, cities and autonomous regions in China, is the backbone of the natural gas pipeline network is an important part of gas supply eastern, central and south China cover, southern China and the east part of northwest China in the vast area, and to turn in north China, success for natural gas to build up the domestic and foreign DaQiOu four air supply stable pattern of networking.
Up to now, "west-east gas sales and points to lose users have to 157, the total development pipe-conveying goods reached 100.4 billion cubic meters, the gas for the first time more than 0.1 trillion cubic meters, to promote China's natural gas industry and local economic development, adjust our country's energy structure, improve the ecological environment, improve the people's living standards to make positive contribution.
Take over west east second line operation since the task, "west-east gas pipeline company operation people increase the strength, special attention to all inspection section of the pipeline connection point. Pipeline protection personnel tracking has gone into operation period of hydraulic protection management on progress. At present, the second line of hydraulic protection projects for the added 167 items. "West-east gas pipeline safety were already optimization effect of high alert of 123, the relevant project management office of emergency management, is controlled west east second line advance machinery, equipment repair d unit configuration of the east, the west line comprehensive emergency plan and the disposal plan, implement d repair resources. The company strengthen put new pipeline emergency repairs to repair d team exercises, and constantly improve the perfect after the production of new pipelines production operation management level.
This year, the second line ZaoYang part to shiyan, camphor tree to xiangtan, nanchang to Shanghai and guangzhou to shenzhen a route to put into production. At present, the relevant administration has begun to tissue engineering supervision, XunXian, the station to production, ensure cohesion into a success.