Your current location:home > News > News Details
China Gas Information
According to the jin coal group news, from the current through the coal-bed methane gas transmission project to taiyuan has fully operative. The pipeline is 50 kilometers, the highest gas transmission capacity of 3 million cubic meters/day.
It is reported, it is estimated that by 2014, the total YongQiLiang taiyuan city will reach 1 billion cubic meters per year. According to the current gas transmission capacity calculation of natural gas demand gap in taiyuan city, Shanxi Province, therefore, great decided to build old-taiyuan coalbed methane gas transport pipeline engineering. The project consists of shanxi coal group construction, the total investment 290 million yuan. Project GuJiaoShi LiGuShe first, north on the south to the north source area in taiyuan city camp village north at the end of the camp, the span 50 kilometers, stand design pressure 4 million mpa, design gas transmission capacity of 2 million cubic meters/day, project is expected to be finished by the end of this year. To build a comprehensive connected CBM extraction using upstream and downstream industry chain, realize low cost, mass transportation CBM, further satisfy taiyuan city residents and the needs of the gas gas car, effectively relieve the gas tense situation in taiyuan city.