Your current location:home > News > News Details
China Gas Information
July 18,, after the production recovery after management platform 3-2 well, still maintained nissan 35000 cubic meters of natural gas levels. Since this year, in qinghai oilfield SeBei a number two, tainan three atmospheric tanaka and stop lying well over the mouth, has completed and stop lying Wells of mouth to restore the government, there are six mouth stop lying well production recovery and the average recovery successful 124800 cubic meters of natural gas production.
SeBei gas field is the fourth is a gas field, easy sand, water, development is difficult. In to restore the government process, technical personnel increases the technology research and technology integration efforts, actively carry out the integration of sand, sand in water with liquid integration as a representative of the new technology experiment, realize the technology to the transition of the compound by monotonous. In addition, to restore the government proposal making the choice, strengthen the process analysis, the plan detailed scientific demonstration, ensure the process measures of rationality. In the operation process, speed, speed up the construction of liquid into the well do strictly to demand, reduce pollution formation. Reasonable use tools to ensure construction success rate of 100%.