Your current location:home > News > News Details
China Gas Information
This winter, straight port road and construction of factory area of nearly 40000 residents, to a whisper of natural gas condition, use of" normal "natural gas. Today, straight port avenue-construction enterprise to the west of the gas line connecting engineering construction, the total length of 1.6 km of natural gas pipeline, will be in a month and a half later, the film the inhabitants all connected to the problems. DuoNian gas
Because construction development to speed up, begin from 2004, straight port road area appeared residents to the problem of "gas", especially in winter, in general, to residents after 11 o 'clock at night, to normal gases, wash a hot bath on. Therefore, chongqing gas group in 2006 to this place underground gas line update, at that time to solve the problem of the more than 10000 residents. Gas However, as in recent years straight port road area of commodity house, at the development and construction of the residents more and more difficult question of gas, appear again, to 2010, the residents of natural gas pressure too small cannot cook a bath of normal reflect, also more and more intense. In order to solve this area residents of the difficult question of gas, the fuel gas group again investment of 1000 yuan, decided to get through straight port construction of the west end avenue-factory gas line, and to this day to be constructed. According to information, a gas line of 1.6 kilometers long, pipeline 219 mm diameter, it will take one and half months for construction. During the construction period, not on the residents gas and travel cause interference.