Your current location:home > News > News Details
China Gas Information
June 25,, suzhou gas group will be on a new batch of natural gas users replacement. The replacement of the community involved for XuJiang road 99, 129 (XuXin home), no. 131, dish xuyu road 178, the JingYuan (dish). To ensure that the user can safe, timely use natural gas, please everyone there at home wait patiently, work with personnel comes to transform gas appliances. The replacement has also established a consultation service centers in XuJiang road, 58, the original furniture factory floor 2 (two) across the industrial and commercial bureau. If users have doubts, you can dial the telephone service 15151552505 inquiry.
On June 24, 30 points when 19, stopping air of the replacement of outdoor construction began to natural gas. Please make a list before user total valve and gas appliances, the valve is closed, when 19 to 21 30 points when 30 points, wait for staff each stick gas appliances, disable mark seal, and at the same time MeiQiBiao readings, and please copy user confirm signature. The meter reading of the users, to please the door lock, and notice of the phone. IC card table, other users will send professional personnel door-to-door service. Each user to transform the gas stove in the period of time before the ignition, is strictly prohibited in gas, in order to avoid accidents.
June 25, 7 when starts, points "brand" provide each gas stoves reconstruction work, please be sure to users in the home, wait until gas appliances, modification, ignition, debugging complete, can away from home, or you will delay time, influence on the day of the user to use. The original gas cookers, water heater must go through professional modification, ignition debugging rear can safe use. Modified gas cookers day, gas water heater transformation within two days to complete. More than two eyes, integrated kitchen stove, household boiler, wall-hang boiler and imported gas stoves and upscale modification by users, with the brand of special maintenance service providers link and make an appointment time (and later, replacement, without modification, forbidden to use), expenses. After the completion of the converted gas stove, please confirm and sign the user to adapted for the staff construction form of users, the construction of al single user united are modified warranty certificate.
24, to 25 8 when to 17, 26, 8 am to 12, the gas group will organize ten several brand of kitchen is provided, water heater manufacturer on the site, need to update sales gas stove, water heater users be sure in June 25 to the purchase of a new gas stoves, ahead of sales to ensure timely after displacement in normal use. At the same time, the gas group update: (1) to release subsidies user indoor gas stove (a) eyes and gas water heater (a) the transformation of a free. (2) must be updated and can transform to voluntarily update on the spot to buy in line with norms new RanQiJu users give subsidies: eyes focal 60 yuan/Taiwan; subsidies Monocular kitchen subsidies 30 yuan/set, gas water heater allowance of 100 yuan per unit. (3) issued by suzhou, users subsidies fuel gas development company bill, id to the consultation service, the field after checking the, enjoy free transformation users no longer enjoy this subsidies. Late this year, please in before July 30, 383 key west road to 1 / f professional market (ganjiang gas stoves destination shan) to receive.