Your current location:home > News > News Details
China Gas Information
24 14, nantong in maritime bureau "sea patrol 089" under five cruise ship monitoring, super-large LNG special transports "sieg ray card and" wheel the north channel port into the mouth. This is the jiangsu nantong port of the first ship mouth berthing LNG (liquefied natural gas) transports. It marked the first, in jiangsu province in China's coastal fourth LNG terminal and trunkline is put into operation.
"Sieg ray card and" wheel nationality 315.16 Marshall islands, the captain meter, width 50 meters, was a ship carrying capacity reaches 212 million cubic meters of super-large LNG special transporters, this voyage 14.5 million cubic meters, carrying about 6.38 tons of liquefied natural gas (LNG) starting from Qatar, the yankees reached the mouth port.
Natural gas in transportation cooling to about - when ℃, low temperature, 162 flammable, rapid covert sex etc is the main risk characteristics, so with high risk, LNG ships high resistance. This chakra into port in its maritime department during within a mile before and after the implementation of the "vacuum" escort, banning other ships into. "Sieg ray card and" port spent two and a half hours.
Jiangsu LNG project in construction began in January 2008. Phase of the project total investment of 6.3 billion yuan, the construction scale 350 tons/year receive quantity, including man-made, stations, docks zhanqiao pier, long-distance pipelines across overseas after production of four parts, with natural gas pipeline to lose and LNG tanker outside sinotrans function. Phase ii scale will increase to 650 tons/year receive quantity, increase slot ship diversions function in 2013, plan on December production. Long-dated scale will reach 1,000 tons/year receive quantity