Your current location:home > News > News Details
China Gas Information
"West-east gas pipeline main tarim oil field outside QiYuanDe kela2 gas field in lunnan area pipeline to production, more than 40 hours in 10, after successfully completed hidden trouble transformation, restore normal supply of fuel gas.
Petrochina tarim oilfield company deputy chief engineer li followed by tracing introduction, nearly seven years running, west-east gas transmission line by high pressure gas pipeline corrosion phenomena appears gradually. In order to eliminate hidden dangers and tarim oilfield 8 kela2 gas field investigations to implement the gas transmission pipeline to shut-down modification; Taken at the same time YingMaiLi gas field, dina deployment of natural gas, gas to guarantee the normal "west-east gas supply.
Tarim oilfield deputy manager TangXin company sales business, said the gas transmission pipeline modifications have been improved complete, "west-east gas supply of gas safety coefficient. 11, kela2 gas field investigations on gas transmission pipeline spreads to already 150 wanfang, and retrofit before flat.
Kela2 gas field to the investigations 159.7 gas pipeline full-length standing km, is connected "west-east gas pipeline to QiYuanDe and the main stand lunnan area an important line. Kela2 gas field since 2004, by this "west-east gas pipeline 564-571 billion square of natural gas