Your current location:home > News > News Details
China Gas Information
From the three line of west-east gas pipeline project opening ceremony that to break the foreign companies for a long time long distance natural gas pipeline to China
According to introducing, the third line construction of west-east gas mass popularization and application to domestic 20 megawatt electric drive, 30 megawatt displacement compressor and 48 inches 900 lb of large diameter line truncation in ball valve, to break the foreign companies in China, the key equipment of long distance natural gas pipeline monopoly, to promote China's economic structural adjustment and industrial upgrading has important significance.
October 16 morning, xinjiang and the western and eastern fujian west-east gas three line engineering construction at the same time. The three line of west-east gas about 7378 km, is divided into three part western, middle and eastern legs. Western xinjiang khorgos to ningxia centre-half, plan completed and put into operation in 2013; Dividing ningxia centre-half to jiangxi province, is to carry out the prophase work, plan 201 three years after the approval of national construction, completed and put into operation in 2015; Eastern jiangxi province to fuzhou, fujian province, in 2014 completed and put into operation.