Your current location:home > News > News Details
China Gas Information
Recently, the xinjiang within the territory of the BaiChengXian carat 3 gas field exploration project formally completed, which laid the kela2 gas field with an annual capacity of 10 billion cubic meters to realize stable long-term plan foundation. Our country west-east gas transmission project to increase a stable source.
According to introducing, carat 3 gas field is located in the territory of BaiChengXian kizil township, is apart from the BaiChengXian city of more than 80 kilometers. Exploration project includes: new set QiZhan 1 seat, the newly built to carat 2 gas collecting main 35.5 km, new power projects, the oil and gas pipeline mixed lose to carat 2 plant processing after the west-east gas transmission pipeline. Gas field exploration project in July 2011 to start construction, design gas capacity of 360 million cubic meters/year.
BaiChengXian tarim oil field gas productivity is the main battlefield, domestic "crassus field" includes the world famous carat 2, north and g deep three big block, is expected to total 2.3 trillion cubic meters of natural gas reserves. Among them, the kela2 gas field in December 2004 is completed and put into operation, design with an annual production capacity of 10.7 billion cubic meters of natural gas, at present, has accumulated to "west-east gas transmission" high quality natural gas pipeline 670 more than cubic meters.